equipment

  1. Home
  2. equipment

A fleet of Atlas Copco hydraulic drill rigs are at work on the project, which include 25 Boomer 353 E hydraulic face drilling rigs, one Boomer XL3 D and seven ROC D7 surface drill rigs. Two stages of tunneling are done beginning with the upper 7.5 meters which are excavated with the Boomer 353 E.